Login for faster access to the best deals. Click here if you don't have an account.

Trainee Technician Full-time Job

2yrs ago   Engineering   Rivers   448 views Reference: Vl4zbq2dprO
Job Details

Tasks

• To execute Field or Workshop Maintenance tasks, to meet work Programs, safety requirements, and quality standards in order to ensure plant integrity, reliability and availability in a safe, efficient, and cost-effective manner

Requirements

To be eligible to apply for the Trainee Technician position, candidate should:

• Possess a Higher National Diploma HND in Mechanical, Electrical / Electronics, Metallurgy or Instrumentation Engineering obtained at a minimum of Upper Credit Level.

• Be able to demonstrate proficiency in information technology.

• Have completed NYSC not earlier than year 2018.

Attachment of the under listed documents is mandatory:

• Government issued Birth Certificate

• Copies of Tertiary education certificates

• Copies of Secondary education certificates

• Copies of Primary education certificates

• NYSC completion certificate

Company Description
Nigeria LNG Limited was incorporated as a limited liability company on May 17, 1989 to harness Nigeria's vast natural gas resources and produce Liquefied Natural Gas (LNG) and Natural Gas Liquids (NGLs) for export. The company is owned by four shareholders, namely, the Federal Government of Nigeria, represented by Nigerian National Petroleum Corporation (49%); Shell (25.6%); Total LNG Nigeria Ltd (15%) and Eni (10.4%). It has wholly-owned subsidiaries: Bonny Gas Transport (BGT) Limited and NLNG Ship Management Limited (NSML). It has wholly-owned subsidiaries: Bonny Gas Transport (BGT) Limited and NLNG Ship Management Limited (NSML). With six trains currently operational, NLNG's plant, on Bonny Island in Rivers State, is capable of producing 22 Million Tonnes Per Annum (MTPA) of LNG, and 5 MTPA of NGLs (LPG and Condensate) from 3.5 Billion (standard) cubic feet per day (Bcf/d) of natural gas intake. NLNG's near term expansion plans include construction of a seventh train to complement the existing six train structure, which when in operation will up the company's total production capacity to 30 million tonnes per annum (MTPA) of LNG. As the arrowhead of Nigeria's efforts to eliminate gas flaring, NLNG's operations have helped reduced Nigeria's Flaring Profile from 65% to below 25%. The company also supplies about 80% of the annual domestic LPG (Cooking Gas) consumption. In all its business and social activities, NLNG's driving force remains its vision to help in building a better Nigeria.